Award Summary for March, 2005
|
Principal
Investigator
|
Department
|
Title
|
Agency
|
Award
Amount
|
Period
|
|
Ching-long Lin
|
IIHR--Hydroscience & Engineering
|
Large Eddy
Simulation of Air Flow Around the
|
US
Department of Defense, Department of the Navy
|
$40,000.00
|
02/01/2005 |
|
Sharif Rahman
|
Center
for Computer-Aided Design (CCAD)
|
Predictive
and Analytical Methods for Rapidly Assessing the Reliability of Commercial
Electronic Packaging for Military/Industrial Environments
|
Rockwell
Collins, Inc.
|
$25,000.00
|
09/01/1998 |
|
A Bradley
|
IIHR--Hydroscience &
Engineering
|
Evaluation of Design-Flood Frequency Methods for Iowa
Streams
|
Iowa Department of Transportation
|
$99,544.00
|
03/01/2005 |
|
Athanasios
Papanicolaou
|
IIHR--Hydroscience &
Engineering
|
Design Procedures and Field Monitoring of Submerged Barbs
for Streambank Protection
|
Iowa Department of Transportation
|
$140,000.00
|
05/01/2005 |
|
Christoph Beckermann
|
Mechanical
Engineering
|
Microporosity Formation in
Alloy Solidification
|
|
$0.00
|
02/01/2002
|