Lesson 26: Stormwater Detention

Learning Objectives

  • Describe the motivation for stormwater detention and its relation to stormwater ordinances and design criteria
  • State how a detention pond changes the downstream flood hydrograph
  • Estimate the approximate detention pond storage required to meet design criteria

Handouts (bring to class)

  • None

Reading Assignment

  • 6.7.2 Runoff Controls
  • 6.7.2.1 Stormwater Impoundments

Homework Problems

  • None

Last changed on 05/03/04 by aab.